Building a Bridge over Tesuque Creek at Bear Wallow / Winsor Trail

When:
July 19, 2014 @ 8:30 am – 3:00 pm
2014-07-19T08:30:00-06:00
2014-07-19T15:00:00-06:00
Where:
Borrego Trailhead
Hyde Park Road
Santa Fe, NM
USA
Cost:
Free
Contact:
Brent Bonwell

We’re going to be rebuilding the Bear Wallow / Winsor bridge this Saturday. Meet at 8:30 am at the Borrego trail head with long pants, long sleeves, sturdy shoes, water and lunch. I hope to be back at the trail head at approx 3pm, assuming we’re not chased away by lightning and rain. I can use a couple people to bring bikes to help carry long beams down to the site. If you’re going to bring a bike, please RSVP with me.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *