Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
La Tierra Trails Work Day 8:30 am La Tierra Trails Work Day @ Calabasas Trailhead (near Antenna) Nov 4 @ 8:30 am – 11:30 am Maintenance work to address erosion issues on La Tierra Trails, including re-route near Junction 2. To sign up contact Tim Rogers at tim@sfct.org Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water. | Galisteo Basin Preserve – Finish Richards Ramble 8:30 am Galisteo Basin Preserve – Finish Richards Ramble @ Galisteo Basin Preserve Nov 6 @ 8:30 am – 12:30 pm Work with REI volunteers on Richards Ramble – might be cold so dress warmly and bring snacks and water. | |||||
Camino de Cruz Blanca Trail Construction 8:30 am Camino de Cruz Blanca Trail Construction @ Camino de Cruz Blanca Nov 11 @ 8:30 am – 12:00 pm Please consider joining us to help complete the Camino de Cruz Blanca Trail. A 90-ft.-long section of the trail was never built, and we have been asked to fill in the gap. This is a little different from our typical … Continue reading | ||||||
Camino de Cruz Blanca Trail Construction 1:00 pm Camino de Cruz Blanca Trail Construction @ Camino de Cruz Blanca Nov 18 @ 1:00 pm – 4:00 pm Please consider joining us to help complete the Camino de Cruz Blanca Trail. A 90-ft.-long section of the trail was never built, and we have been asked to fill in the gap. This is a little different from our typical … Continue reading | ||||||
Maintenance work to address erosion issues on La Tierra Trails, including re-route near Junction 2.
To sign up contact Tim Rogers at tim@sfct.org
Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water.
Work with REI volunteers on Richards Ramble – might be cold so dress warmly and bring snacks and water.
Please consider joining us to help complete the Camino de Cruz Blanca Trail. A 90-ft.-long section of the trail was never built, and we have been asked to fill in the gap.
This is a little different from our typical trail work – we will prepare a four-foot wide surface, place weed barrier, metal edging, and steps, fill in with crusher fines, and compact. We will be working at 1300 Camino de Cruz Blanca: Closest parking is at Dorothy Stewart trailhead, Wilderness Gate Trailhead, or St. John’s Trailhead.
Let me know if you can make it. Thanks! – Tim
Please consider joining us to help complete the Camino de Cruz Blanca Trail. A 90-ft.-long section of the trail was never built, and we have been asked to fill in the gap.
This is a little different from our typical trail work – we will prepare a four-foot wide surface, place weed barrier, metal edging, and steps, fill in with crusher fines, and compact. We will be working at 1300 Camino de Cruz Blanca: Closest parking is at Dorothy Stewart trailhead, Wilderness Gate Trailhead, or St. John’s Trailhead.
Let me know if you can make it. Thanks! – Tim
Teen volunteers will join with Santa Fe County personnel and Tano Road Association volunteers to build a .5 mile trail in a wide easement on the south side of Tano Road between Montoyas and San Rafael. We’ll meet at the intersection of Tano and Montoyas.
Pingback: Santa Fe Conservation Trust and Trails