Calendar

Sun Mon Tue Wed Thu Fri Sat
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Borrego/Bear Wallow Trail 9:00 am
Borrego/Bear Wallow Trail @ Borrego/Bear Wallow Trail
Apr 24 @ 9:00 am – 3:00 pm
Water is making its home on some parts of the trail causing additional erosion and resource damage. Let’s get out there and redirect that water! Let me know if you’d like to attend any of these. I’ll provide directions and … Continue reading
25
26
Hermit’s Peak Trail 10:00 am
Hermit’s Peak Trail @ Hermit's Peak Trail
Apr 26 @ 10:00 am – 3:00 pm
This is a new re-route on Hermit’s Peak trail. Serious flooding is causing serious erosion. If you’ve never been over on the East side of the forest, please join us! Let me know if you’d like to attend any of … Continue reading
27
28
29
30
Apr
26
Sun
Hermit’s Peak Trail @ Hermit's Peak Trail
Apr 26 @ 10:00 am – 3:00 pm

This is a new re-route on Hermit’s Peak trail. Serious flooding is causing serious erosion. If you’ve never been over on the East side of the forest, please join us!

Let me know if you’d like to attend any of these. I’ll provide directions and any important information.

Please bring a daypack with lunch, plenty of water, sunscreen, etc. As always please wear long pants, long sleeves, above-ankle (non-skid) boots, leather gloves, and a smile. I’ll provide hard hats (new color has arrived), safety glasses, and tools.

May
3
Sun
La Tierra Trails Flow Trail Clean-Up @ La Tierra Trails, Frijoles Trailhead
May 3 @ 9:00 am – 1:00 pm

Help Santa Fe Fat Tire Society work on the first professionally designed and constructed purpose built mountain bike trail in the Santa Fe area.  Tools will be provided, but please bring gloves and wear sturdy shoes and long pants.  Come prepared for the weather with appropriate clothing, sunscreen, hats, plenty of water and food for a 4-6 hour work day. Join us at the Frijoles trail head at 9am to take part in the workday.

May
6
Wed
CANCELLED – Winsor Trail – CANCELLED @ Winsor Trail
May 6 @ 9:00 am – 3:00 pm

We will continue to punch in a re-route started last year on the Winsor Trail.

Let me know if you’d like to attend any of these. I’ll provide directions and any important information.

Please bring a daypack with lunch, plenty of water, sunscreen, etc. As always please wear long pants, long sleeves, above-ankle (non-skid) boots, leather gloves, and a smile. I’ll provide hard hats (new color has arrived), safety glasses, and tools.

May
8
Fri
Petroglyph Hill Tour @ Petroglyph Hill Tour
May 8 @ 9:00 am – 12:00 pm

RSVP required

Contact melohmann@santafecountynm.gov to be added to the waiting list

Participants will need to have the ability to hike a short distance and negotiate uneven, rocky terrain. Due to the undeveloped nature of the open space and associated hazards, participants will be asked to sign an Acknowledgement of Risk and Release of Liability.

 

May
9
Sat
Galisteo Basin Preserve- Improvements to the Trail Network @ Cowboy Shack
May 9 @ 8:30 am – 1:30 pm

Volunteers will head out to evaluate and fix identified drainage issues on the existing trail network. After enjoying lunch on the trail, volunteers will complete their work by 1:30 pm.

Food + Supplies: Commonweal will provide light snacks, water and all necessary trail-finishing tools. The Trails Alliance of Santa Fe and the Fat Tire Society have generously donated use of their tools for these events.

Work Requirements and Cautions: Trail building is a moderately strenuous activity. Please wear pants, long-sleeve shirt, hat and heavy work boots.

Bring: A sack lunch, sunscreen, water bottle and work gloves.

Space for each event is limited to 15 volunteers. To register for either day, please email Gretchen Grogan at gretchen.grogan@commonwealconservancy.org or call her at (505) 982-0071, ext. 106. Please title your email message: RSVP for Trail Maintenance.

One Response to Calendar

  1. Pingback: Santa Fe Conservation Trust and Trails

Comments are closed.