Calendar

Nov
20
Fri
La Tierra Trails Work Day @ Chili Line Rd. (Junction 22)
Nov 20 @ 10:00 am – 1:00 pm

Maintenance work to address erosion issues on La Tierra Trails.  We will meet at “Junction 22” at the small trailhead parking lot on Chili Line Rd. (the short Relief Route frontage road on the way to the motorcross zone).  This is not an easy spot to find, if you have not been there – if you need help, see Junction 22 on the City’s La Tierra Trails Map, or give us a call for directions.IMG_3474

Among other efforts, we will be filling in a massive arroyo cut at the start of the “whoop-dee-doo’s” east of Junction 20.  Afterwards we may take a look at the remains of the old Chili Line railbed and consider the possibilities for preservation and restoration of this historic resource by volunteers in 2016.  (If you are interested in historic rail lines and trails, check out the presentation at the “Building Creative Communities Conference” earlier this month at http://www.sfct.org/wp-content/uploads/2014/10/Rail-Trails-as-Creative-Heritage-Trails.pdf.)

To sign up, contact Tim Rogers at tim@sfct.org or (505) 989-7019.

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water.

Dec
8
Tue
La Tierra Trails Work Day @ Frijoles Trailhead, Camino de los Montoyas
Dec 8 @ 9:00 am – 12:00 pm

IMG_3474One more volunteer work day to address erosion issues in La Tierra Trails.  We will meet at Frijoles Trailhead on Camino de los Montoyas and focus on mitigating and filling in a couple of sharp gullies on the wide gravel trail.

Possibly we can re-visit single-track where we worked in August between Junctions 26 and 29.  I will also head out and pick up some miscellaneous items left along the trails to the north while we are at it.

To sign up, contact Tim Rogers at tim@sfct.org or (505) 989-7019

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water.

Mar
24
Thu
Dale Ball Work Day @ Dale Ball Trails South, Cerro Gordo Trailhead
Mar 24 @ 9:00 am – 12:00 pm

 

Join us as we address maintenance needs on Dale Ball Trails, South Section,  south of Upper Canyon Rd.

Volunteers rapidly turn an eroding gully into a smoothly sloped tread that sheds water.

We’ll miss you, David.

We’ll meet at the “Cerro Gordo Trailhead” at the corner of Upper Canyon Rd. and Cerro Gordo Rd., and make our way by foot (or ride) down to the pedestrian entrance to the trails down Upper Canyon Rd., where there is no parking

We will work on the connection between Dale Ball Trails and Dorothy Stewart Trails above the “Arroyo Polay.”

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water.

To sign up, contact Tim Rogers at tim@sfct.org

Mar
31
Thu
Dale Ball Work Day @ Dale Ball Trails South, Cerro Gordo Trailhead
Mar 31 @ 9:00 am – 12:00 pm

Join us as we address continue maintenance work on Dale Ball Trails, South Section,  south of Upper Canyon Rd.

Volunteers rapidly turn an eroding gully into a smoothly sloped tread that sheds water.

We’ll miss you, David.

We’ll meet at the “Cerro Gordo Trailhead” at the corner of Upper Canyon Rd. and Cerro Gordo Rd., and make our way by foot (or ride) down to the pedestrian entrance to the trails down Upper Canyon Rd., where there is no parking

We will work on the connection between Dale Ball Trails and Dorothy Stewart Trails above the “Arroyo Polay.”

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water.

To sign up, contact Tim Rogers at tim@sfct.org

Apr
2
Sat
La Piedra Trail Workday @ Parking - Little Tesuque Trailhead
Apr 2 @ 9:00 am – 1:00 pm

La Piedra Workday – Accessed through the Little Tesuque Trailhead on Hyde Park Road. Tools are provided. Please come dressed for the weather, long pants, long sleeves, work gloves and ankle covered boots. Please bring plenty of water and sunscreen.

Please confirm attendance with Carol Branch @ cbranch@santafecountynm.gov

One Response to Calendar

  1. Pingback: Santa Fe Conservation Trust and Trails

Comments are closed.