Calendar

Aug
28
Sun
Install Trail Signs at Galisteo Basin Preserve @ Galisteo Basin Cowboy Shack
Aug 28 @ 8:30 am

Commonweal/GBP is planning on installing 20-25 user signs on the GBP trail system on Saturday, August 27th, and need another 4-5 volunteers to help make it happen. The are installing 4×4 posts near intersections of trails with different usages. The signs say “THIS TRAIL IS OPEN TO” followed by images for hikers, bikers, and equestrians, as appropriate. This is being supported by the Santa Fe Horse Coalition riders, some of whom will also be helping install the signs. Exact time is TBD, but most likely 8 or 8:30 until done, hopefully by noon.

Let me know if you can help out.

Thanks,

Brent Bonwell @ brent@bonwell.org

Aug
31
Wed
Dale Ball Work Day @ Dale Ball Trails South, Cerro Gordo Trailhead
Aug 31 @ 8:30 am – 11:30 am

042

Join us in helping maintain and improve Dale Ball Trails – South, revisiting our re-route of 2014, and beyond.  We’ll meet at 8:30 at Cerro Gordo Trailhead, at the corner of Upper Canyon Rd. and Cerro Gordo Rd.

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water.

To sign up, contact Tim Rogers at tim@sfct.org

Sep
21
Wed
Dale Ball Work Day @ Dale Ball Trails South, Wildeness Gate Trailhead
Sep 21 @ 9:00 am – 12:00 pm

042

Join us in helping maintain and improve Dale Ball Trails – South, including posting new junction signs (finally!).  Parking is very limited at Wilderness Gate Trailhead, you can also try the Dorothy Stewart Trailhead or St. John’s Trailhead and walk up to meet us at Wilderness Gate.

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water.  I’ll bring the tools and the signs as well as work gloves for whoever needs them.

To sign up, contact Tim Rogers at tim@sfct.org or (505) 989-7019.

Sep
22
Thu
Dale Ball Work Day: Posting Signs @ Dale Ball Trails Central, Cerro Gordo Trailhead
Sep 22 @ 9:00 am – 12:00 pm

042

Join us in posting new junction signs on Dale Ball Trails, Central Section.

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water.

To sign up, contact Tim Rogers at tim@sfct.org

Sep
24
Sat
Borrego/Bear Wallow Trail Re-route @ Borrego/Bear Wallow Trail Head
Sep 24 @ 8:45 am – 1:00 pm

Work will continue on the trail re-route along the Borrego section of the Borrego/Bear Wallow Trail. That day is also the 23rd annual National Public Lands Day, which encourages Americans to celebrate their public lands by helping take care of them. Volunteers will meet at the Borrego/Bear Wallow trailhead at 8:45 a.m.

Lunch will be provided and work hours are 9 a.m. to 1 p.m. Volunteers should wear long sleeves, long pants, above-ankle non-skid boots and leather gloves to protect them from terrain that can be thorny and rocky. Please bring a backpack with sunscreen and at least two quarts of water. Tools and hard hats will be provided by the Santa Fe National Forest.

For additional information, please contact Jennifer Sublett, Española District Volunteer Coordinator, at jasublett@fs.fed.us or 505-753-7331. Volunteers should RSVP to Jennifer so the Forest can provide lunches, tools and hardhats for all participants.

One Response to Calendar

  1. Pingback: Santa Fe Conservation Trust and Trails

Comments are closed.