Calendar

Oct
31
Tue
Dale Ball Work Day @ Dale Ball Trails
Oct 31 @ 9:00 am – 12:00 pm

002

Come work on Dale Ball Trails with city trail volunteers.  We’ll meet on Cerro Gordo Rd. at the informal trail head at the bottom of “the luge” (a/k/a Arroyo del Cerro).  This is the small parking area on the left, about halfway from Cerro Gordo Park to Upper Canyon Rd.  (If there’s not enough space we can shuttle to and from Cerro Gordo Trailhead at Upper Canyon Rd.)

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water.  I’ll bring the tools and supplies as well as work gloves for whoever needs them.

To sign up, contact Tim Rogers at tim@sfct.org or (505) 989-7019.

Nov
8
Wed
Dale Ball Central Work Day @ Sierra del Norte Trailhead
Nov 8 @ 9:00 am – 12:00 pm

Come work on Dale Ball Trails with city trail volunteers. We’ll meet at Sierra del Norte Trailhead (a/k/a “The Corral”) and then make our way south to where Dale Ball Trails cross Cerros Colorados Rd.

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water. I’ll bring the tools and supplies as well as work gloves for whoever needs them.

To sign up, contact Tim Rogers at tim@sfct.org or (505) 989-7019.

Nov
11
Sat
Lower Winsor Work Day (ride in from Bishop’s Lodge) @ Lower Winsor
Nov 11 @ 9:00 am – 3:00 pm

There will be a workday on the lower Winsor, 9am-3pm Saturday November 11th. We’ll be completing the raising of the trail tread in the “narrows” section, just above the highest bridge on the lower Winsor and doing some prep work for bridging the remaining 3 Winsor/Big Tesuque creek crossings.

This will be a “ride in workday”. We have permission from Bishop’s Lodge to meet and park on their property. Head North on Bishop’s Lodge Road, passing the main Bishop’s Lodge entrance, to Bauer Road. There’s a small parking area on the left just after the gate on Bauer road and/or we can park where the stables and tennis courts used to be. This is still a FS workday, so long sleeves, long pants, head protection are still required. Helmets will work in place of hard hats. We have authorization for mechanized support and will be able to carry boots, gloves and long pants for everyone. You will need to bring water and food.

We won’t be able to do the work if the ground is frozen so this workday will only happen if the low Friday night is above 20 and the forecast high is at least 40.

Please RSVP to make sure we have enough tools.

Nov
12
Sun
Glorieta Camps Access trail @ Glorieta Camps
Nov 12 @ 9:00 am – 12:00 pm

Sunday, 9am SHARP at the Glorieta Camps main gate.  We’ll be working on building more of the Glorieta Access trail.  We got over 1/2 of the initial section built 2 weeks ago and will be working on the rest. We’ll work until around noon, have some lunch, and then ride the great trails at GC.  Another sunny day, with a high forecast for mid-50’s.

 

SFFTS will provide all the tools needed for the trail work.

 

RSVP to me ( brent@bonwell.org ) if you haven’t already, so I’ll have enough tools and know to look for you at the meeting point.

Nov
17
Fri
Dale Ball Central Work Day @ Sun Mountain Trailhead
Nov 17 @ 9:00 am – 12:00 pm

Come work on the Sun Mountain Trail with city trail volunteers.  We’ll meet at the trailhead on Old Santa Fe Trail (just north of E. Zia Rd.) and focus on the lower part of the trail where we can do some erosion control.

Bring work boots, long pants/shirt sleeves, sun protection, snacks, and water. I’ll bring the tools and supplies as well as work gloves for whoever needs them.

To sign up, contact Tim Rogers at tim@sfct.org or (505) 989-7019.

One Response to Calendar

  1. Pingback: Santa Fe Conservation Trust and Trails

Comments are closed.